
The church needed to expand their sanctuary, add parking spaces and re-vamp the site Storm Drain system. The challenge on this project was a large Storm Drain line that exits right under the new wall location. So Hillside engineered and constructed Keystone walls for them with this in mind. Up to 15' tall and very strong walls were built in order to accommodate the surcharge loading of a fully loaded fire truck. The General Contractor was Pacific Building Group - the walls were completed on time and within budget.
General Contractor: Pacific Building Group
Year built: 2013